Reject a task
Only teams with customer review enabled: other teams get 403 The "customerReview" feature is not enabled for this team. Reject the task under review, naming the quality criteria it fails and explaining what is wrong. The LLM QA check then checks this evidence: if it agrees, the reject is final, the item fails at this node, and nothing is billed for the task; otherwise the review returns with the check’s reason for a new decision, or expires if its deadline has passed. With force, the check is skipped and the reject is final at once; a forced reject is accepted only after the LLM QA check has returned a reject of this review, so reject without force first.
Authorizations
Path Parameters
Body
A reject with its evidence.
Response
The review after the decision
A customer review of one task, with its content, quality criteria and decisions.
Time the review closed, as an ISO 8601 timestamp, or null while it is open.
^(?:(?:\d\d[2468][048]|\d\d[13579][26]|\d\d0[48]|[02468][048]00|[13579][26]00)-02-29|\d{4}-(?:(?:0[13578]|1[02])-(?:0[1-9]|[12]\d|3[01])|(?:0[469]|11)-(?:0[1-9]|[12]\d|30)|(?:02)-(?:0[1-9]|1\d|2[0-8])))T(?:(?:[01]\d|2[0-3]):[0-5]\d:[0-5]\d(?:\.\d+)?(?:Z))$Deadline for a decision, as an ISO 8601 timestamp. From then on the review takes no decisions, but it closes a little later: a review waiting for a decision expires shortly after the deadline, and its task is accepted automatically (the expert is paid and the task is billed); a review checking a reject closes when the LLM QA check answers.
^(?:(?:\d\d[2468][048]|\d\d[13579][26]|\d\d0[48]|[02468][048]00|[13579][26]00)-02-29|\d{4}-(?:(?:0[13578]|1[02])-(?:0[1-9]|[12]\d|3[01])|(?:0[469]|11)-(?:0[1-9]|[12]\d|30)|(?:02)-(?:0[1-9]|1\d|2[0-8])))T(?:(?:[01]\d|2[0-3]):[0-5]\d:[0-5]\d(?:\.\d+)?(?:Z))$Review status. needs_review: waiting for the first decision. returned: the LLM QA check did not confirm the last reject, so the review waits for a new decision. checking: the LLM QA check is checking a reject, and decisions are refused until it answers. accepted: the team accepted the task. rejected: the reject is final, either forced or confirmed by the LLM QA check. expired: the deadline passed while the review was open, whether it waited for a decision or was checking a reject the check then did not confirm, so the task was accepted automatically.
needs_review, returned, checking, accepted, rejected, expired Time the task was submitted, as an ISO 8601 timestamp.
^(?:(?:\d\d[2468][048]|\d\d[13579][26]|\d\d0[48]|[02468][048]00|[13579][26]00)-02-29|\d{4}-(?:(?:0[13578]|1[02])-(?:0[1-9]|[12]\d|3[01])|(?:0[469]|11)-(?:0[1-9]|[12]\d|30)|(?:02)-(?:0[1-9]|1\d|2[0-8])))T(?:(?:[01]\d|2[0-3]):[0-5]\d:[0-5]\d(?:\.\d+)?(?:Z))$